Wet/dry bag configurations
Configure each module around the material, part envelope, throughput, cycle time, and quality-system requirements.

Product Detail
A stable production platform for powder preforming and room-temperature isostatic pressing
Specification Snapshot
Available Modules
Configure each module around the material, part envelope, throughput, cycle time, and quality-system requirements.
Configure each module around the material, part envelope, throughput, cycle time, and quality-system requirements.
Configure each module around the material, part envelope, throughput, cycle time, and quality-system requirements.
Configure each module around the material, part envelope, throughput, cycle time, and quality-system requirements.
Example Configurations
These configurations illustrate the selection logic. Final model, usable-zone size, pressure and temperature limits, and cooling configuration are defined against the process, regulatory pathway, and facility interfaces.
| Example Model | Pressure | Temperature | Usable Zone / Chamber | Configuration / Process | Applications |
|---|---|---|---|---|---|
| CIP-LAB-200 | 200 MPa | Room temperature | Φ200 × 500 mm | Wet-bag configuration | R&D for ceramics and cemented carbides |
| CIP-DRY-500 | 300 MPa | Room temperature | Φ500 × 1000 mm | Automated dry-bag cycle | Batch forming of powder preforms |
| CIP-LARGE-900 | 250 MPa | Room temperature | Φ900 × 1800 mm | Semi-automatic wet-bag cycle | Large powder preforms |
CTA Ladder
Start with a process-window assessment, then advance to a formal RFQ once the operating boundaries are clear.
Complete an internal review using standards, the glossary, and technical articles before submitting a full RFQ.
Explore ResourcesValidateShare the material, manufacturing route, defect type, part envelope, and performance targets so the pressure-temperature window and validation plan can be assessed.
View the Validation PathSpecifyOnce the usable zone, throughput, facility utilities, and quality-document requirements are defined, proceed to equipment selection and quotation.
Submit an Engineering RFQProcurement Inputs
Each product page connects the equipment platform to applicable materials, process windows, acceptance documentation, and the inputs required from your team.